Item No | Name of Work/Project | Name of Administration | Work Place | Scope of work |
---|
1 | Earth works, bridge and pavement (bitumen hot mixture pavement) construction works on road between BURSA and KARACABEY KM:6+500-25+000 ; reinforcement construction works on road between KM:25+00 and -64+000 | 14th Regional Directorate of Highway of Republic of Turkey– Bursa | BURSA | Earth works, 6 pcs of bridge construction, art works, pavement works and bitumen hot mixture pavement works on road of 58 km |
2 | Asphalt pavement and patch works on main arterial roads, streets and avenues within the border of Bursa Metropolitan Municipality. | Bursa Metropolitan Municipality | BURSA | 340.000 tons bitumen hot mixture pavements and asphalt patch works inside of Bursa city. |
3 | Road section construction of İZNİK Beltway (divided road) KM:0+000-6+583,43, earth works, art works, pavement works( bitumen hot mixture pavements) bridge constructions; earth works, art works, pavements ( divided road, divided surface treatment, minor road, surface treatment) and enforcement works YENİŞEHİR-İZNİK State Highway between KM:6+583,43 and 24+827,10 | 14th Regional Directorate of Highway of Republic of Turkey– Bursa | İZNİK-YENİŞEHİR/ BURSA | 25 km road construction of double highway |
4 | Earth works, art works and bitumen hot mixture pavement works on BURSA-ULUDAĞ Road between KM: 7+000 and 33+000, II. Tourism region between KM:0+000 and 2+000, SARIALAN(Yellow Region) between KM:0+000 and 3+000 | 14th Regional Directorate of Highway of Republic of Turkey– Bursa | ULUDAĞ/BURSA | Earth works, art works, pavements and bitumen hot mixture pavements on section of 31 km road within the scope of Rehabilitation of Road Standards, of |
5 | Road construction work throughout district and Hacı Aslan Str., Kocaorman Str., Seymen Str., Hürriyet Str., Yeniköy Str., Mimar Sinan Str., and Kolej Str. İn Başiskele District of Kocaeli Metropolitan Municipality | Kocaeli Metropolitan Municipality | KOCAELİ | Earth works, substructure works, art works, pavement works and bitumen hot mixture pavement works on new and existing roads |
6 | Zoning road opening of 40mt in Yunuseli Neighborhood; border, footpath and road arrangements works | Osmangazi Municipality | BURSA | Earth works, sub-base, border and footpath works within the scope of zoning road opening |